Lake Erie Interconnector

Erie West
Erie Converter station
Lake Erie
(1000.000 MW)
Haldimand Converter station
Nanticoke

Substation to Converter cabling information missing.

Landfall to Converter cabling information missing.

Landfall to Converter cabling information missing.

Substation to Converter cabling information missing.

United States
Canada

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
United States
Landfall
Pennysylvania
Converter
Erie Converter station
Substation
Erie West

Subsea Cabling

Cable Name Lake Erie
Cable Type
Cable Current HVDC
Status Consent Authorised
Status Comments The ITC Lake Erie Connector is a proposed 1,000 MW, bi-directional, high-voltage direct current (HVDC) underwater contracted transmission line that will provide the first direct link between the markets of the Ontario Independent Electricity System Operator (IESO) and PJM Interconnection (PJM).
Capacity MW 1000.000 MW
Cable Tech
Total Length of Cable 117.00 km
Length Submarine 57.00 km
Length Land
DC Voltage 320 kV
AC Voltage
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Canada
Landfall
Ontario
Converter
Haldimand Converter station
Substation
Nanticoke
Owner-Offshore Transmission
Stakeholder

Unlock with a freemium account -United States of America

Description
Date Event Description
Freemium Only 2023 Unlock with a freemium account Subscribers only field
Freemium Only 2022 Unlock with a freemium account Project is expected to be completed in 2022.... Subscribers only field
Freemium Only 2020 Unlock with a freemium account The project is expected to begin construction in 2... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Canada’s National Energy Board issued a Certificat... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The U.S. Army Corps of Engineers issued the necess... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The Pennsylvania Department of Environmental Prote... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The U.S. Department of Energy granted the project ... Subscribers only field
Freemium Only 2016 Unlock with a freemium account ITC has completed the necessary system impact stud... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The geotechnical and geophysical work has been com... Subscribers only field
Freemium Only 2014 Unlock with a freemium account ITC acquired the rights to develop the Lake Erie C... Subscribers only field