Lolland-Asko Replacement Cable Interconnector

Stigsnaes
Lolland-Asko Replacement Cable
Nakskov
Denmark
Denmark

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Denmark
Landfall
Sevedø
AC Voltage
145 kV
Cable Type Landfall To Substation
Underground
Substation
Stigsnaes

Subsea Cabling

Cable Name Lolland-Asko Replacement Cable
Cable Type
Cable Current HVAC
Status Fully Commissioned
Status Comments
Capacity MW
Cable Tech
Total Length of Cable
Length Submarine 28.00 km
Length Land 19.40 km
DC Voltage
AC Voltage 145 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments The total cabling consists of 2 x28 km 3-core submarine XLPE cable (Al), and 116 km underground XLPE cable (Al) comprising of 6 x 14.6 km on Lolland and 6 x 4.8 km on Zealand.

Country & Landfall 2

Country
Denmark
Landfall
Kaster Hage
AC Voltage
145 kV
Cable Type Landfall To Substation
Underground
Substation
Nakskov
Consultant-EIA
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description