MONtenegro-ITAly (MONITA) Second Module Interconnector

Villanova
Villanova
MONtenegro-ITAly (MONITA) Second Module
(600.000 MW)
Lastva
Lastva
Italy
Montenegro

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Italy
Landfall
Pescara
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
16.00 Km
AC Voltage
400 kV
Converter
Villanova
Cable Type Converter To Substation
Underground
Substation
Villanova
Grid Connection Point
Villanova

Subsea Cabling

Cable Name MONtenegro-ITAly (MONITA) Second Module
Cable Type Interconnector
Cable Current HVDC
Status Pre-Construction
Status Comments TYNDP 2016 Project Index: 28, Project Classification: Mid-term Project, PCI Label: 3.19.1 TYNDP 2018 Project Index: 28
Capacity MW 600.000 MW
Cable Tech
Total Length of Cable 415.00 km
Length Submarine 393.00 km
Length Land 22.00 km
DC Voltage 500 kV
AC Voltage
Configuration Bipolar
Project Cost Mill 775.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments The cable route passes through a sea area within Croatian maritime jurisdiction. The original route was redirected after the route interfered with Croatia's oil and gas exploration.

Country & Landfall 2

Country
Montenegro
Landfall
Budva
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
6.00 Km
AC Voltage
400 kV
Converter
Lastva
Cable Type Converter To Substation
Underground
Substation
Lastva
Grid Connection Point
Lastva
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2026 Unlock with a freemium account Subscribers only field
Freemium Only 2024 Unlock with a freemium account Estimated start of installation of second cable... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore