Prince Edward Island Replacement Cable Interconnector

Memramcook
Prince Edward Island Replacement Cable
(360.000 MW)
Borden-Carleton
Canada
Canada

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Canada
Landfall
Cape Tormentine (mainland)
Cable Type Landfall To Substation
Overhead
Substation
Memramcook

Subsea Cabling

Cable Name Prince Edward Island Replacement Cable
Cable Type
Cable Current HVAC
Status Fully Commissioned
Status Comments
Capacity MW 360.000 MW
Cable Tech
Total Length of Cable
Length Submarine 16.50 km
Length Land
DC Voltage
AC Voltage 138 kV
Configuration
Project Cost Mill 140.00 Mill
Project Cost Currency CAD
Website Visit
Project Comments Both substations required upgrades to accommodate the new cabling.

Country & Landfall 2

Country
Canada
Landfall
Borden-Carleton (PE Island)
Cable Type Landfall To Substation
Overhead
Substation
Borden-Carleton
Developer
Stakeholder
Description
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Operator
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Date Event Description
Freemium Only 2017 Unlock with a freemium account Subscribers only field
Freemium Only 2017 Unlock with a freemium account Cable installation was completed with the end of t... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Submarine cable protection, if required, will be u... Subscribers only field
Freemium Only 2017 Unlock with a freemium account On this day 90% of the onshore work was completed.... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Submarine cable lay of the second cable continued ... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Submarine cable lay of the second cable commenced ... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Submarine cable lay of the first cable commenced o... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Pre-trenching work continued with the arrival of t... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Pre-trenching work continued with the arrival of ... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Pre-trenching started in the near shore areas at b... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Divers were on site at Cape Tormentine to access t... Subscribers only field
Freemium Only 2016 Unlock with a freemium account The project received Environmental Approvals to pr... Subscribers only field