Skagerrak 1 and 2 Interconnector

Kristiansand
Kristiansand
Skagerrak 1 and 2
(500.000 MW)
Tjele
Tjele
Norway
Denmark

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Norway
Cable Type Landfall To Converter
Overhead
AC Voltage
300 kV
Converter
Kristiansand
Cable Type Converter To Substation
Overhead
Substation
Kristiansand
Grid Connection Point
Kristiansand

Subsea Cabling

Cable Name Skagerrak 1 and 2
Cable Type Interconnector
Cable Current HVDC
Status Fully Commissioned
Status Comments
Capacity MW 500.000 MW
Cable Tech HVDC
Total Length of Cable 240.00 km
Length Submarine 127.00 km
Length Land 113.00 km
DC Voltage 250 kV
AC Voltage
Configuration Bipolar
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments The total submarine cable length for Skagerrak 1, 2 and 3 is 127km and the total land cable length is 113km. The project is currently monopolar with Skagerrak 3 going in the opposite direction. Previously the project had been bipolar.

Country & Landfall 2

Country
Denmark
Cable Type Landfall To Converter
Overhead
AC Voltage
150 kV
Converter
Tjele
Cable Type Converter To Substation
Overhead
Substation
Tjele
Grid Connection Point
Tjele
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-HVDC Converter
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Maintenance-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-HVDC Converter
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Vessel-Operations and Maintenance
Stakeholder
Description
Date Event Description
Freemium Only 2017 Unlock with a freemium account Subscribers only field
Freemium Only 2017 Unlock with a freemium account At 10:07 Skagerrak 2 failed approximately 37 km fr... Subscribers only field
Freemium Only 2013 Unlock with a freemium account A supplementary application was made.... Subscribers only field
Freemium Only 2013 Unlock with a freemium account Didn't have to enter a General Activities Plan (GA... Subscribers only field
Freemium Only 2012 Unlock with a freemium account After the unsolicited application it was found tha... Subscribers only field
Freemium Only 2011 Unlock with a freemium account The second and last amendment of the original unso... Subscribers only field
Freemium Only 1977 Unlock with a freemium account Pole 1 and 2 were commission in the period of 1976... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore