South Aegean: Levitha-Kounoupoi/Makra Anafi/Megalo Sofrano Interconnector

Levitha
South Aegean: Levitha-Kounoupoi/Makra Anafi/Megalo Sofrano
Kounoupoi

Landfall to Substation information missing.

Landfall to Substation information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece
Substation
Levitha

Subsea Cabling

Cable Name South Aegean: Levitha-Kounoupoi/Makra Anafi/Megalo Sofrano
Cable Type
Cable Current HVAC
Status Consent Application Submitted
Status Comments The Aegean Project will have a complex of 311km HVAC cables connecting 8 islands with Levitha, the hub of the Aegean Project.
Capacity MW
Cable Tech
Total Length of Cable 163.50 km
Length Submarine 163.50 km
Length Land
DC Voltage
AC Voltage 150 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
Substation
Kounoupoi
Owner-Offshore Transmission
Stakeholder
Description
Date Event Description
Freemium Only 2025 Unlock with a freemium account Subscribers only field
Freemium Only 2024 Unlock with a freemium account Estimated installation year based on commissioning... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore