Storstrommen Kabel 2 Interconnector

Orehoved
Storstrommen Kabel 2
Masnedo

Landfall to Substation information missing.

Landfall to Substation information missing.

Denmark
Denmark

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Denmark
Substation
Orehoved

Subsea Cabling

Cable Name Storstrommen Kabel 2
Cable Type
Cable Current HVAC
Status Decommissioned
Status Comments
Capacity MW
Cable Tech
Total Length of Cable
Length Submarine 3.99 km
Length Land
DC Voltage
AC Voltage 132 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments In the Storstrommen area there were originally 9 submarine cables in the 132kV transmission system. Changes occurred due to two new building projects in the area, namely the building of a new bridge and the expansion of the Port of Masnedo. The original cables in the area were 1,2,3,4,5,a+b and c+d. The new bridge location meant that cables 2, 3 and 4 had to be dismantled and were replaced along a different route by cable 8. The expansion of the port led to cables a+b needing to be dismantled well ahead of their estimated end of life in 2034. The new cable set up is cables 1,5,8,c+d.

Country & Landfall 2

Country
Denmark
Substation
Masnedo
Owner-Offshore Transmission
Stakeholder
Description
Date Event Description
Freemium Only 2016 Unlock with a freemium account Subscribers only field
Freemium Only 2015 Unlock with a freemium account The authorisation was given to alter the transmiss... Subscribers only field
Freemium Only 2014 Unlock with a freemium account The application was made to alter the transmission... Subscribers only field