TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Horns Rev 3 Substation

The cables (array cables) from the wind turbines will be routed through J-tubes onto the transformer platforms, where they are connected to Medium Voltage (MV) switchgear which, via three 220 kV/MV transformers, is connected to the 220 kV export cable. The 220 kV export cables will run from the transformer platforms to the shore and further on to the existing substation at Endrup where the connection to the electrical transmission network will take place via a 400/220 kV transformer. Dimensions updated from 36x24x17 .
Name:
Horns Rev 3 Substation
Status:
Operational

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Foundation
Type
Weight
Comments

Topside
Weight
Dimensions (LxWxH)
Helideck

Electrical Specification
Number of Transformers
Transformer Power
Switch Gear
Other Equipment