Image of Barrow Substation


General Information Substation Name Barrow Substation correct
Substation Status Operational correct
Latitude 53.99 ° correct
Longitude -3.27 ° correct
Comments correct
Cost of the Substation EUR(mill) 12 correct
Cost Description AREVA's Transmission and Distribution division (T&D) won a contract in the region of 12 million euros to design, manufacture and install the United Kingdom's first offshore high-voltage substation. correct
Foundation Foundation Type Monopile correct
Foundation Weight 686 t correct
Foundation Comments The weight is broken down as follows: transition piece 208 ton, naked steel top frame 105 ton, monopile 355 ton and J-tubes 18 ton. correct
Topside Topside Weight 480 t correct
Topside Dimensions (LxWxH) 23x15x10 m correct
Helideck No correct
Electrical Specifications Number of Transformers 1 correct
Transformer Power 120 MVA correct
Transformer Ratio 33/132 kV correct
Switchgear 132kV and 33kV GIS correct
Other Equipment 33kV board 14 panel including protection. Relay and control panel suite room. LVAC and DC plant room (includes UPS for navigation lights). 225kVA standby diesel generator. 5MVAr shunt capacitor bank modules. INERGEN/ water mist fire suppression system. Auxiliary transformer. correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US
Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/transmission/substationdetails.aspx.