Acta Orion

SOV and Walk 2 Work

Vessel image
Acta Orion was originally scheduled for delivery in September 2015 but was delayed until October. The hull was constructed in Poland with outfitting taking place in the north of the Netherlands. Immediately after delivery, the vessel was chartered by contractor Van Oord and used to support the construction of the Gemini Offshore Wind Farm.

Acta Orion has a fast rescue daughter craft which can be used for transfer if needed and weather permitting. The vessel also has two fixed boat landings, port and starboard, plus a facility to refuel CTVs (25m3 per hour).

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
General Information
Name
Acta Orion
Operator
Unlock with a freemium account
Vessel Category
Unlock with a freemium account
Vessel Classification
Maximum Endurance
Flag

Build Information
Construction Country
Shipyard
Delivery Date

Main Characteristics
Length Overall (LOA)
Minimum Draft
Maximum Draft
Passengers

Speed
Transit Speed
Maximum Speed

Cargo Deck
Free Deck Space
Max. Deck Load
Deadweight

Design Criteria
Max Operable Significant Wave Height

Vessel Identification
Call Sign
IMO Number
MMSI

Positioning
Dynamic Positioning (DP) Class
DP Notes

Links
Operator Website
Vessel Spec.

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore