TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

MPI Resolution

Heavy Maintenance and Construction

4C Offshore | MPI Resolution
MPI Resolution was the first purpose built vessel for the offshore wind market. Utilities onboard include: Client Offices, Hospital, Conference Room, Gymnasium, Coffee Shop, Galley, Laundry, Mess Room, Male/Female Locker Rooms & WC’s. The vessel has been on long term charter with E.On under a framework agreement. In October 2016, the legs were extended.

In July 2018, Van Oord acquired the MPI Offshore business, MPI Resolution and MPI Adventure. The deal was completed at the end of September 2018. Van Oord delivered a maintenance contract with MHI Vestas as part of the deal.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
General Information
Name
MPI Resolution
Operator
Unlock with a freemium account
Vessel Category
Unlock with a freemium account
Vessel Classification
Maximum Endurance
Flag

Build Information
Construction Country
Shipyard
Year Last Converted

Main Characteristics
Length Overall (LOA)
Minimum Draft
Maximum Draft
Passengers

Speed
Transit Speed

Cargo Deck
Free Deck Space
Max. Deck Load
Cargo
Deadweight

Jacking
Max Jacking Speed
Num legs
Leg length

Design Criteria
Max Operable Significant Wave Height
Max. Operable Tide Current
Max. Operable Wind Speed

Vessel Identification
Call Sign
IMO Number
MMSI

Positioning
Dynamic Positioning (DP) Class
DP Notes

Cranes
First Crane Capacity
First Crane Radius
First Crane Description
Second Crane Capacity
Second Crane Radius
Second Crane Description
Max. Lifting Capacity

Links
Operator Website
Vessel Spec.