Borssele 3 and 4 - Blauwwind Offshore Wind Farm

31 Dec 2021: Luxcara, an international renewable energy asset management firm, signed an agreement with Van Oord to acquire a 10% share in the Blauwwind Project. Green Giraffe  was mandated by Van Oord to advise on their divestment. The transaction was signed on 22 December 2021 and closed on 31 December 2021. Current ownership: Partners Group 45%; Shell 20%; Eneco 10%; DGE 15%; and Luxcara 10%.
Location:
Netherlands
Status:
Fully Commissioned
Capacity:
731.5 MW
4C Offshore | Location Map: Lat(51.700) Lon(2.928)

Subscribers can track wind farms on their dashboard.

General Information
Name
Borssele 3 and 4 - Blauwwind
Other Names
BWFS III, BWFS IV, Borssele Aangewezen windenergiegebied
Country
Netherlands
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Comments
Website

Developers/Owners/Operators
Type
Organisation
Operator-Offshore Transmission
Owner
Owner-Offshore Transmission

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning

Revenue Mechanism
Revenue Details
Revenue
EUR 54.5/MWh (EUR 54.5/MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
731.5 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
51.699756°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life