24 Mar 2023: Update 28/11/2023: Cerulean winds have signed all three of their INTOG exclusivity agreements. Cerulean Winds and Frontier Power International have been awarded three lease options for the Central North Sea in the highly competitive INTOG leasing round, the results of which were announced by Crown Estate Scotland on 24 March 2023. Cerulean Winds will be looking to pay option fees amounting to £67m, £35m and £35m for the three TOG respective projects. Crown Estate Scotland (CES) has announced the results of the INTOG round. 13 projects out of 19 applications have been offered Exclusivity Agreements. 5 IN projects, totalling just over 139km2 and 499 MW, will be offered a 25-year seabed lease. 8 TOG projects, totalling 1534km2 and 5GW, will be offered a 50-year seabed lease. If the projects accept the agreement, development work can be initiated and Marine Scotland will complete the INTOG Sectoral Marine Plan (SMP). If the project is successful in the SMP, an option agreement will be offered and it will subsequently go through planning, consenting and financing phases. After these phases are complete, the project can progress onto a full seabed lease. Option agreements are expected in 2024 after the SMP finalisation and will earn CES roughly £262m in applicant fees. To secure an option agreement, developers must also provide a Supply Chain Development Statement (SCDS).
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1008 MW
4C Offshore | Location Map: Lat(57.739) Lon(-0.224)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1008 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
57.73945°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life