Princess Elisabeth - Fairy Bank

22 Mar 2022: Scientists monitoring the environmental impact of offshore wind farms in the Princess Elizabeth Zone summarize latest findings in a report. The PEZ requires and environmental permit and Natura 2000 permit. EDEN2000 project, " Exploring options for a nature-proof De velopment of offshore wind farms inside a Natura 2000 area", aims to provide an answer to the question under which conditions the windfarms can be realised through 25 separate studies that are in progress. The studies were started in 2019 and will be completed by the end of this year. The final report of the full investigation will be ready in early 2023. The results of this scientific research will be included in the tender conditions for the construction of wind turbines, under the responsibility of AD Energie of the FPS Economy. Results from study at other Belgian windfarms indicate that  life in and around wind farms has not yet achieved stability, 13 years after their construction.  Biodiversity and bird movements appear more variable than observed previously. Mitigation for bird collision avoidance is better understood. The artificial reefs between the turbines continue to grow as certain species of fish are attracted to the increasing amount of food they provide. Echolocation data indicate that underwater noise mitigation measures are effective in reducing the impact of pile driving on harbor porpoises.
Location:
Belgium
Status:
Development Zone
Capacity:
1500 MW
4C Offshore | Location Map: Lat(51.473) Lon(2.439)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
51.473089°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life