Latest event on Changhua - (ZoP 26) - Taipower

The Ministry of Economic Affairs has allocated 300MW to the project under Taiwan’s Feed-in-Tariff (“FIT”) program.
This is a significant step for the project, as it allocates capacity for project to connect to Taiwan’s grid, and advances the project’s ability to execute a 20-year power contract under Taiwan’s FIT regime.
Next step is to obtain the establishment permit and to secure the feed-in-tariff by signing a power purchase agreement.
Read more

Latest Update: 30 April 2018

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
Project Details for Changhua - (ZoP 26) - Taipower
General Information Name Changhua - (ZoP 26) - Taipower correct
Other names 離岸風力發電第二期計畫 Changhua 5 - Development Zone correct
Country name Taiwan correct
Region Changhua correct
Comments 10m average wind speed 8.3m/s

August 2015 - feed-in tariff for offshore wind, set at TWD 7.1085/kWh for first ten years of operation, and TWD 3.4586/kWh for the ten years following.

The Bureau of Energy, Ministry of Economic Affairs has invited applications from developers to develop this site.

The area is one of 36 designated for offshore wind development by the government, providing a total capacity of 25GW if all 36 sites are developed to their full potential.

A single site must have a capacity greater than 100MW and an average power density of 5MW per km2 or greater.

The government has a target of 4GW of offshore wind by 2030.

Each zone has been selected as it avoids

(1) wetlands,

(2) set-fishing areas,

(3) aquatic animal and plant breeding conservation areas,

(4) Beluga whale habitat areas,

(5) critical wildlife habitats,

(6) Taijiang Park,

(7) artillery firing zones,

(8) other Control Zones and ranges,

(9) port and mooring areas,

(10) subsea pipelines

(11) spent shells and forbidden anchoring zones,

(12) Taiwan coastal nature conservation area,

(13) important habitat for wild birds,

(14) protected reef area,

(15) artificial reef fishing areas,

(16) Penghu submarine cable,

(17) submarine cables (fiber optic cable),

(18) natural gas pipeline,

(19) offshore demonstration reward sites,

(20) Linkou Power Plant and ash zone,

(21) Akira coal terminal and waterways,

(22) industrial zones

(23) fishing port ranges.
correct
Round (or category) Round One Grid Allocation, Zone of Potential correct
Development status Concept/Early Planning correct
Power & Turbines Project capacity 300 MW - 812 MW correct
Turbine model Not Decided correct
Turbine capacity 5 MW - 10 MW correct
Number of turbines correct
Total turbine height correct
Hub height correct
Rotor diameter correct
Foundation Grounded: correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost USD(mill) 4700.00 correct
Location & Environment Sea name Taiwan Strait correct
Centre latitude 24.079° correct
Centre longitude 120.217° correct
Area 81 km2 correct
Depth range (Chart Datum) 35 m - 46 m correct
Depth range stated by developer 40 m - 49 m correct
Distance from shore (reported) 9.7 km correct
Distance from shore (computed from centre) 14.8 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter/Collector platforms correct
Offshore transformers 1 correct
Grid connection point West Zhangbin correct
Cable landing point Xianxi correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 575103 correct
CO2 reduced per year 1162284 tonnes correct
SO2 reduced per year 27030 tonnes correct
Expected life correct
Other Website correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
12
StatusName
Fully Commissioned Formosa 1 OWF Phase 1 Formosa 1 OWF Phase 1
Pre-Construction Formosa 1 OWF Phase 2 Formosa 1 OWF Phase 2
Consent Application Submitted Changhua - Taipower Changhua - Taipower
Concept/Early Planning Changfang - (ZoP 27) - CIP Changfang - (ZoP 27) - CIP
Concept/Early Planning Changhua - (ZoP 26) - Taipower Changhua - (ZoP 26) - Taipower
Concept/Early Planning Changhua - (ZoP 28) - Strait Wind Power Changhua - (ZoP 28) - Strait Wind Power
Concept/Early Planning Changhua - South - Taipower Changhua - South - Taipower
Concept/Early Planning Future Zones 1 Future Zones 1
Concept/Early Planning Future Zones 2 Future Zones 2
Concept/Early Planning Future Zones 3 Future Zones 3
Concept/Early Planning Future Zones 4 Future Zones 4
Concept/Early Planning Future Zones 5 Future Zones 5
Concept/Early Planning Greater Changhua North East (ZoP 13) - Ørsted Greater Changhua North East (ZoP 13) - Ørsted
Concept/Early Planning Greater Changhua North West (ZoP 12) - Ørsted Greater Changhua North West (ZoP 12) - Ørsted
Concept/Early Planning Greater Changhua South East (ZoP 15) - Ørsted Greater Changhua South East (ZoP 15) - Ørsted
Concept/Early Planning Greater Changhua South West (ZoP 14) - Ørsted Greater Changhua South West (ZoP 14) - Ørsted
Concept/Early Planning Guanyin (ZoP 2) - wpd Guanyin (ZoP 2) - wpd
Concept/Early Planning Hai Long II - (ZoP 19) - Yushan Energy/Northland Power Hai Long II - (ZoP 19) - Yushan Energy/Northland Power
Concept/Early Planning Hai Long III - (ZoP 18) - Yushan Energy/Northland Power Hai Long III - (ZoP 18) - Yushan Energy/Northland Power
Concept/Early Planning Haiding 1 - (ZoP 11) - Formosa IIII Haiding 1 - (ZoP 11) - Formosa IIII
Concept/Early Planning Haiding 2 - (ZoP 16) - Formosa IIII Haiding 2 - (ZoP 16) - Formosa IIII
Concept/Early Planning Haiding 3 - (ZoP 17) - Formosa IIII Haiding 3 - (ZoP 17) - Formosa IIII
Concept/Early Planning Ideol/CSC - Floating Project Ideol/CSC - Floating Project
Concept/Early Planning Miaoli - (ZoP 5+6) - Formosa II Miaoli - (ZoP 5+6) - Formosa II
Concept/Early Planning Penghu - Taipower Penghu - Taipower
Concept/Early Planning W1S - EOLFI W1S - EOLFI
Concept/Early Planning W2N - EOLFI W2N - EOLFI
Concept/Early Planning W2S - EOLFI W2S - EOLFI
Concept/Early Planning W3 - EOLFI W3 - EOLFI
Concept/Early Planning Xidao - CIP Xidao - CIP
Concept/Early Planning Xinzhu Shi - (ZoP 4) - Asia Cement Corporation Xinzhu Shi - (ZoP 4) - Asia Cement Corporation
Concept/Early Planning Yunlin - wpd Yunlin - wpd
Concept/Early Planning Zhongneng - (ZoP 29) - CSC/CIP/Diamond Generating Asia Zhongneng - (ZoP 29) - CSC/CIP/Diamond Generating Asia
Development Zone Zone of Potential - 33 Zone of Potential - 33
Development Zone Zone of Potential - 34 Zone of Potential - 34
Development Zone Zone of Potential - 35 Zone of Potential - 35
Development Zone Zone of Potential - 36 Zone of Potential - 36
Development Zone Zone of Potential - 7 Zone of Potential - 7
Development Zone Zone of Potential - 8 Zone of Potential - 8
Cancelled Changhua - (ZoP 27) - Strait Wind Power Changhua - (ZoP 27) - Strait Wind Power
Cancelled Changhua - North - Taipower Changhua - North - Taipower
Cancelled Changhua North - wpd Changhua North - wpd
Cancelled Changhua Offshore Pilot Project (COPP) - TGC Changhua Offshore Pilot Project (COPP) - TGC
Cancelled Chiayi - Star Energy Chiayi - Star Energy
Cancelled Fufang - (ZoP 28) - CIP Fufang - (ZoP 28) - CIP
Cancelled Fuhai Offshore Windfarm - TGC Fuhai Offshore Windfarm - TGC
Cancelled Fuhai Phase III - TGC Fuhai Phase III - TGC
Cancelled Hanbao - TGC Hanbao - TGC
Cancelled Offshore Wind Demonstration Penghu Island Offshore Wind Demonstration Penghu Island
Cancelled Penghu - TGC Penghu - TGC
12
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=tw49.