RoleOrganisation 
Developer
correct
Main Contractor-EPCI
Jan de Nul/Hitachi Joint Venture
Client: LogIn
correct
Owner correct
Project Details for Changhua - Taipower
General Information Name Changhua - Taipower correct
Other names 海洋竹南離岸式風力發電計畫 彰化離岸風場 correct
Country name Taiwan correct
Region Changhua correct
Comments According to MOEA, in addition to the 50% incentive fees for the installation of demonstration units provided through the Demonstration Incentive Program, NT$ 2.5 hundred million (8.33 million US$) will also be subsidized for the

demonstration wind farm development.

Demonstration Incentive Program requires that two turbines are demonstration/test models
correct
Round (or category) Demonstration Incentive Program - Wind Farm correct
Development status Consent Application Submitted correct
Power & Turbines Project capacity 109.2 MW correct
Turbine model HTW5.2-127 (Hitachi Ltd) correct
Turbine capacity 5.2 MW correct
Number of turbines 21 correct
Total turbine height correct
Hub height correct
Rotor diameter 127 m correct
Foundation Grounded: Jacket correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost correct
Location & Environment Sea name Taiwan Strait correct
Centre latitude 23.987° correct
Centre longitude 120.247° correct
Area 11 km2 correct
Depth range (Chart Datum) 15 m - 26 m correct
Depth range stated by developer 15 m - 26 m correct
Distance from shore (reported) 6 km correct
Distance from shore (computed from centre) 7.6 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter/Collector platforms None correct
Offshore transformers None correct
Grid connection point Dacheng correct
Cable landing point Yongxing(永興村) correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 4 correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage 33 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section area 500 mm2 correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 77341 correct
CO2 reduced per year 156307 tonnes correct
SO2 reduced per year 3635 tonnes correct
Expected life correct
Other Website correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
12
StatusName
Fully Commissioned Formosa 1 OWF Phase 1 Formosa 1 OWF Phase 1
Consent Application Submitted Changhua - Taipower Changhua - Taipower
Consent Application Submitted Formosa 1 OWF Phase 2 Formosa 1 OWF Phase 2
Concept/Early Planning Changfang - (ZoP 27) - CIP Changfang - (ZoP 27) - CIP
Concept/Early Planning Changhua - (ZoP 26) - Taipower Changhua - (ZoP 26) - Taipower
Concept/Early Planning Changhua - (ZoP 28) - Strait Wind Power Changhua - (ZoP 28) - Strait Wind Power
Concept/Early Planning Changhua - South - Taipower Changhua - South - Taipower
Concept/Early Planning Future Zones 1 Future Zones 1
Concept/Early Planning Future Zones 2 Future Zones 2
Concept/Early Planning Future Zones 3 Future Zones 3
Concept/Early Planning Future Zones 4 Future Zones 4
Concept/Early Planning Future Zones 5 Future Zones 5
Concept/Early Planning Greater Changhua North East (ZoP 13) - Ørsted Greater Changhua North East (ZoP 13) - Ørsted
Concept/Early Planning Greater Changhua North West (ZoP 12) - Ørsted Greater Changhua North West (ZoP 12) - Ørsted
Concept/Early Planning Greater Changhua South East (ZoP 15) - Ørsted Greater Changhua South East (ZoP 15) - Ørsted
Concept/Early Planning Greater Changhua South West (ZoP 14) - Ørsted Greater Changhua South West (ZoP 14) - Ørsted
Concept/Early Planning Guanyin (ZoP 2) - wpd Guanyin (ZoP 2) - wpd
Concept/Early Planning Hai Long II - (ZoP 19) - Yushan Energy/Northland Power Hai Long II - (ZoP 19) - Yushan Energy/Northland Power
Concept/Early Planning Hai Long III - (ZoP 18) - Yushan Energy/Northland Power Hai Long III - (ZoP 18) - Yushan Energy/Northland Power
Concept/Early Planning Haiding 1 - (ZoP 11) - Formosa IIII Haiding 1 - (ZoP 11) - Formosa IIII
Concept/Early Planning Haiding 2 - (ZoP 16) - Formosa IIII Haiding 2 - (ZoP 16) - Formosa IIII
Concept/Early Planning Haiding 3 - (ZoP 17) - Formosa IIII Haiding 3 - (ZoP 17) - Formosa IIII
Concept/Early Planning Ideol/CSC - Floating Project Ideol/CSC - Floating Project
Concept/Early Planning Miaoli - (ZoP 5+6) - Formosa II Miaoli - (ZoP 5+6) - Formosa II
Concept/Early Planning Penghu - Taipower Penghu - Taipower
Concept/Early Planning W1S - EOLFI W1S - EOLFI
Concept/Early Planning W2N - EOLFI W2N - EOLFI
Concept/Early Planning W2S - EOLFI W2S - EOLFI
Concept/Early Planning W3 - EOLFI W3 - EOLFI
Concept/Early Planning Xidao - CIP Xidao - CIP
Concept/Early Planning Xinzhu Shi - (ZoP 4) - Asia Cement Corporation Xinzhu Shi - (ZoP 4) - Asia Cement Corporation
Concept/Early Planning Yunlin - wpd Yunlin - wpd
Concept/Early Planning Zhongneng - (ZoP 29) - CSC/CIP/Diamond Generating Asia Zhongneng - (ZoP 29) - CSC/CIP/Diamond Generating Asia
Development Zone Zone of Potential - 33 Zone of Potential - 33
Development Zone Zone of Potential - 34 Zone of Potential - 34
Development Zone Zone of Potential - 35 Zone of Potential - 35
Development Zone Zone of Potential - 36 Zone of Potential - 36
Development Zone Zone of Potential - 7 Zone of Potential - 7
Development Zone Zone of Potential - 8 Zone of Potential - 8
Cancelled Changhua - (ZoP 27) - Strait Wind Power Changhua - (ZoP 27) - Strait Wind Power
Cancelled Changhua - North - Taipower Changhua - North - Taipower
Cancelled Changhua North - wpd Changhua North - wpd
Cancelled Changhua Offshore Pilot Project (COPP) - TGC Changhua Offshore Pilot Project (COPP) - TGC
Cancelled Chiayi - Star Energy Chiayi - Star Energy
Cancelled Fufang - (ZoP 28) - CIP Fufang - (ZoP 28) - CIP
Cancelled Fuhai Offshore Windfarm - TGC Fuhai Offshore Windfarm - TGC
Cancelled Fuhai Phase III - TGC Fuhai Phase III - TGC
Cancelled Hanbao - TGC Hanbao - TGC
Cancelled Offshore Wind Demonstration Penghu Island Offshore Wind Demonstration Penghu Island
Cancelled Penghu - TGC Penghu - TGC
12
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=tw24.