Developers/Owners/Operators (3)

Turbines (4)

Substations (7)

RoleOrganisation 
Contractor-Heavy Load Logistics(Substation)
Site move + load out of substation
correct
Installer(LEAD)-Substation correct
Installer-Substation-Topside
Scaldis has been awarded the contract to install the substation topside.
correct
Main Contractor-Substation
Windfang Consortium (Fabricom/Iemants N.V./GeoSea/Crompton Greaves)
Client: LogIn
correct
Main Contractor-Substation correct
Manufacturer-Substation-Electrical
CG Holdings Belgium NV (CG Power Systems Belgium NV)
correct
Supplier-Crane(Substation)
Palfinger Marine- und Beteilungs-GmbH
correct

Foundations (15)

RoleOrganisation 
Contractor-Heavy Load Logistics(Foundation) correct
Designer(Detailed)-Foundation(Substation)
SLPC carried out the detail design work for the offshore substation foundation.
Number of substations: LogIn
correct
Designer(Detailed)-Foundation(Turbine) correct
Designer-Foundation(turbine) correct
Installer-Foundation(substation)
Scaldis has been awarded the contract to install the substation foundation.
Number of foundations: LogIn
correct
Installer-Foundation(turbine) correct
Installer-Foundation(turbine) correct
Installer-Transition Piece(turbine) correct
Manufacturer-Foundation(substation)
Smulders was responsible for the fabrication of the substation foundation.
Number of foundations: LogIn
correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Transition Piece(turbine) correct
Manufacturer-Transition Piece-Primary Steel(turbine)
2013 - Fabrication of transition pieces
Number of transition pieces: LogIn
correct
Manufacturer-Transition Piece-Secondary Steel(turbine) correct
Supplier-Flanges
Supplied 160 TP flanges and 80 monopile flanges, for the new double hull monopile design.
Transition pieces 80 x ø5000mm and 80 x ø5410mm Monopiles 80 x ø5200mm
correct

Array Cabling (5)

RoleOrganisation 
Installer-Array Cabling correct
Installer-Array Cabling(components) correct
Installer-Cabling(pull-in) correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems correct

Export Cabling (3)

RoleOrganisation 
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling correct

Met Masts (12)

RoleOrganisation 
Designer-Met Mast correct
Installer-Foundation(met mast) correct
Installer-Foundation(met mast) correct
Installer-Met Mast(Equipment install) correct
Installer-Tower(met mast) correct
Installer-Transition Piece(met mast) correct
Main Contractor-Met Mast correct
Manufacturer-Foundation(metmast) correct
Manufacturer-Foundation-Primary Steel(metmast) correct
Manufacturer-Met Mast(Tower) correct
Manufacturer-Transition Piece-Met Mast correct
Supplier-MetOcean Equipment correct

Consultants (7)

RoleOrganisation 
Consultant-Certification correct
Consultant-Certification correct
Consultant-Health & Safety
Acted as the HSE advisor for Siemens.
correct
Consultant-Other correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Other
Between 2010-2012 8.2 Consulting provided technical consultancy, contract negotiation
assistance, inspection of offshore met mast
correct
Consultant-Weather Forecasting
StormGeo AS
Client: LogIn
Metocean forecasting, route forecasting and warning services.
correct

Others (13)

RoleOrganisation 
Contractor-Diving correct
Installer-Scour Protection correct
Maintenance-Other
Maintenance & repair service for MetBuoy together with provision real-time website for display of Met Data.
correct
Manufacturer-Other
MC CONSTRUCTION (CLEVELAND) LTG
Fabrication and mobilisation/demobilisation of the MPI Adventure and Discovery for foundation work scopes as well as the installation of Siemens blade racks. Work took place between June 2014 and September 2015.
correct
Manufacturer-Other
Fabrication and mobilisation/demobilisation of the MPI Adventure and Discovery for foundation work scopes as well as the installation of Siemens blade racks. Work took place between June 2014 and September 2015.
correct
Manufacturer-Other correct
Port
Cuxhaven Port
Client: LogIn
The port was used for storage and shipping of the monopile foundations and TPs or Ballast Nedam.
correct
Supplier-Helicopter
Awarded a contract for helicopter supply in September 2012. HTM has been supporting O&M services and the hoisting of service teams to the turbines since November 2015.
correct
Supplier-Hydraulic Hammer
MHU 800S - 2.1m diameter pile for metmast
Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Navigation Aids
Sabik Offshore Ltd
Client: LogIn
correct
Supplier-Other
Provision of RTK Navigation Systems onboard multiple CTV and Construction Vessels.
correct
Surveyor-Geophysical
MMT AB
Client: LogIn
correct
Surveyor-Other correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de05.