Developers/Owners/Operators (5)

RoleOrganisation 
Developer
Borkum Riffgrund I Offshore Windpark A/S GmbH & Co. oHG
correct
Operator
Borkum Riffgrund I Offshore Windpark A/S GmbH & Co. oHG
correct
Owner correct
Owner
Owns 32% of the project after buying a stake from Dong Energy. Ownership structure Dong Energy (50%), Kirkbi (32%) and the Oticon Foundation (18%).
Value: LogIn
correct
Owner
Owns 18% of the project after buying a stake from Dong Energy. Ownership structure Dong Energy (50%), Kirkbi (32%) and the Oticon Foundation (18%).
Value: LogIn
correct

Turbines (8)

RoleOrganisation 
Contractor-Heavy Load Logistics(Turbine) correct
Installer(LEAD)-Turbine correct
Installer-Turbine correct
Main Contractor-Turbine Supply and Installation
Siemens AG
Client: LogIn
correct
Maintenance-Turbine correct
Manufacturer-Turbine
Siemens AG
Client: LogIn
correct
Manufacturer-Turbine(Tower) correct
Supplier-Plate Steel(Tower)
Delivered plates for all 78 towers, (steel grade - S355JO+N+S355J2+N+S355JR+N = 12.000 TO) Tower fabricator: Gestamp-Windar
correct

Substations (4)

Foundations (23)

RoleOrganisation 
Contractor-Grouting(substation) correct
Contractor-Heavy Load Logistics(Foundation)
Unloading, storage and transport of Transition Pieces and monopiles
correct
Designer(Detailed)-Foundation(Substation) correct
Designer(Detailed)-Foundation(Turbine)
DONG Energy Wind Power A/S was responsible for the detailed design of all monopile turbine foundations.
Number of turbines: LogIn
correct
Designer-Foundation correct
Designer-Foundation(turbine)
COWI A/S
Client: LogIn
correct
Designer-Foundation(turbine) correct
Designer-Foundation(turbine) correct
Installer-Foundation(substation) correct
Installer-Foundation(turbine) correct
Installer-Foundation(turbine) correct
Installer-Transition Piece(turbine) correct
Maintenance-Foundations correct
Manufacturer-Foundation(substation)
Supply of offshore substation (jacket and topside) for delivery in July 2013.
Number of foundations: LogIn
correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Transition Piece(turbine) correct
Manufacturer-Transition Piece-Primary Steel(turbine) correct
Manufacturer-Transition Piece-Secondary Steel(turbine)
2014 - Fabrication of transition pieces
Number of transition pieces: LogIn
correct
Supplier-Plate Steel(Foundation) correct
Transport-Foundation correct

Array Cabling (4)

RoleOrganisation 
Installer-Array Cabling
CT OFFSHORE
Client: LogIn
Signed a contract to install and bury 44 array cables. The vessels SIA, VOS SYMPATHY installed the cables with the survey vessel MV SANDER 2.
Cable Length km: LogIn
correct
Maintenance-Array Cable correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems
Supply the TekLink cable protection system (5th generation) for the export cabling.
correct

Export Cabling (6)

RoleOrganisation 
Installer-Export Cabling correct
Installer-Export Cabling(burial) correct
Main Contractor-Export Cabling
Norddeutsche Seekabelwerke GmbH & Co. KG (General Cable Nordic AS)
Client: LogIn
correct
Maintenance-Export Cable correct
Manufacturer-Export Cabling
Norddeutsche Seekabelwerke GmbH & Co. KG (General Cable Nordic AS)
Client: LogIn
correct
Supplier-Installation Equipment (Export Cable) correct

Met Masts (0)

Consultants (8)

RoleOrganisation 
Consultant-Certification correct
Consultant-Health & Safety
Staatliches Gewerbeaufsichtsamt Oldenburg acted as the supervisory authority for the health and safety of the project. Offshore wind farms in the EEZ were assigned to the department in the year 2009 by the ministry of social affairs of lower saxony.
correct
Consultant-Other correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Other
Grontmij
Client: LogIn
correct
Consultant-Other correct
Consultant-Other
Transport and installation inspection of the turbines. Provided foundation certification.
correct
Contractor-Marine Coordinator correct

Others (25)

RoleOrganisation 
Contractor-Other correct
Contractor-Other correct
Contractor-Other correct
Contractor-Other correct
Contractor-Other
Hughes SSE announced that after a successful tender submission with energy giants Dong Energy, the company has been awarded a subsea inspection framework covering Dong Energy’s European windfarms.
correct
Installer-Other correct
Installer-Scour Protection
Scour protection around 93 WTG foundations. The works took place between 2014-2014.
correct
Maintenance-Other correct
Manufacturer-Other
Power generators for TP's - CWind No 2014.
correct
Manufacturer-Other
Strainstall UK Ltd
correct
Port correct
Port Services correct
Project Management-Other correct
Supplier-Helicopter correct
Supplier-Helicopter
Awarded a contract for helicopter supply in October 2012. Operations started in August 2013. Supporting O&M services and the hoisting of service teams to the turbines.
correct
Supplier-Hydraulic Hammer
S-800 Hydrohammer
Pile Diameter - 2.13m
Year - 2013
Substation Jackets

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Hydraulic Hammer
S-2000 Hydrohammer
Pile Diameter - 4.75m
Year - 2014
Turbine Monopiles

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Navigation Aids
Sabik Offshore Ltd
Client: LogIn
correct
Supplier-Other
Supply of Safety Equipment, PPE, SOLAS Transits Suits, SOLAS Life Jackets, Personal Locating Beacons, Working at Height Equipment. PPE Inspection and Servicing of Equipment.
correct
Supplier-Other
Setup and Commissioning of metering equipment / Delivery and commissioning of metering read out software.
correct
Supplier-Other
Grontmij
Client: LogIn
correct
Supplier-Other correct
Supplier-Other correct
Supplier-Other correct
Surveyor-Geotechnical
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Partial Generation/Under Construction Merkur Merkur
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction OWP Albatros OWP Albatros
Under Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de04.