Additional 2 GW (Roadmap 2030+)

04 Dec 2021: The Danish Ministry of Finance published that draft proposal for the 2022 Finance Bill in December 2021. As part of the green sub-agreement the parties recognize that there is a need for an increased expansion of renewables in order to reach the 70% target by 2030. The parties agreed to add 2 GW of offshore wind capacity before the end of 2030. This would be in addition to the (1 GW) Thor, (1.2 GW) Hesselo and third 1 GW tender to connect to the Bornholm energy island wind farm, as agreed under the 2018 Energy Agreement. The Government will initiate the process for a political decision before summer 2022. It has also been agreed that the government, in connection with the energy and supply plan in 2022, will present analyses that can form the basis for a further 1 GW tender. Denmark is already looking at expanding the study area for the Bornholm energy island by 1 GW. The parties have also said they will discuss proposed energy islands in the North Sea to ensure 10GW can be established “as soon as possible” or by 2040. Overall, the parties agree to set aside DKK 1.3 bn as part of the Finance Act for new green initiatives.
Location:
Denmark
Status:
Development Zone
Capacity:
2000 MW
4C Offshore | Location Map: Lat(56.610) Lon(7.738)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
56.609934°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life