28 Apr 2021: On 28 April 2021, the Danish Energy Agency granted Energinet a permit to carry out preliminary studies for 3 GW North Sea offshore wind farms connecting to the energy islands. The permit is valid from 1 May 2021 to 31 December 2023. The feasibility studies contribute to the strategic environmental assessment  (SEA). The winner of the tenders to develop the windfarms will need to conduct a full EIA for their specific wind farm design.
Location:
Denmark
Status:
Development Zone
Capacity:
1000 MW
4C Offshore | Location Map: Lat(56.303) Lon(6.418)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Upgrade your subscription to include Wind Farms
Min. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Max. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Upgrade your subscription to include Wind Farms or Cable
Total Turbine Height
Upgrade your subscription to include Wind Farms
Hub Height
Upgrade your subscription to include Wind Farms
Rotor Diameter
Upgrade your subscription to include Wind Farms
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable
Foundation Comments
Upgrade your subscription to include Wind Farms

Location & Environment
Sea Name
North Sea
Latitude
56.302972°
Longitude
Upgrade your subscription to include Wind Farms or Cable
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Upgrade your subscription to include Wind Farms or Cable
Depth Range (Stated by Developer)
Upgrade your subscription to include Wind Farms or Cable
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)
Upgrade your subscription to include Wind Farms or Cable

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Upgrade your subscription to include Wind Farms or Cable
Grid Connection Point
Unlock with a freemium account
Cable Landing Point
Upgrade your subscription to include Wind Farms or Cable

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Upgrade your subscription to include Wind Farms or Cable
Additional Requirements (AC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (AC)
Upgrade your subscription to include Wind Farms or Cable
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (DC)
Upgrade your subscription to include Wind Farms or Cable

Nominal Voltage
Upgrade your subscription to include Wind Farms or Cable
Comments
Upgrade your subscription to include Wind Farms or Cable

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable
Expected Life
Upgrade your subscription to include Wind Farms