Nordsøen II - Screened Area - Island Connection

22 Jun 2020: The government and a broad majority in the Folketing signed an agreement on an ambitious climate plan on 22nd June. The agreement, together with the agreement on a green waste sector, forms the first part of the government's overall climate action plan. The agreement includes plans for: · Establishment of two energy Islands by 2030; one at Bornholm at 2 GW and one in the North Sea at 3 GW. The North Sea Island will be expanded to 10 GW in the long term. The island in the North Sea is being expanded in phases as electricity consumption rises and the energy island joins trade links with other countries. The energy islands must not only produce electricity, but also in the long term be able to connect technologies that can store or convert the green power to green fuels (so-called "Power-to-X"). It is a condition of the projects that they are profitable. Work on the energy islands will start immediately and parties involved will be continuously updated of the scheduling. · The establishment of the second wind farm agreed in the 2018 energy agreement will be located at Hesselø with a capacity of 1 GW. The parties have agreed that the wind farm should be operational by 2027 and have advanced the schedule compared to the original 2018 agreement. · The third wind farm agreed in the 2018 energy agreement will be included in the first phase of the energy islands and will be realised by 2030. · The funds reserved for the connection of second and third projects of the Energy Agreement 2018 will be re-prioritized to finance elements of the agreement. · The parties agree that DKK 4 million will be allocated in 2020, DKK 121 million in 2021 and DKK 89 million in 2022 for a preliminary study of the two energy islands and the park at Hesselø, at the same time with the re-prioritization of the funds allocated for preliminary studies of parks 2 and 3 of the Energy Agreement 2018. The preliminary studies are the first step in the establishment of the energy islands. · The energy islands and Hesselø must be based on the principles of the Energy Agreement 2018, which states that in future, offshore wind should be market-driven as far as possible without public support. · Other key points of the agreement include: promotion of Power-to-X plants and CO2 capture technology; electrification of the heating sector; Support for biogas and other green gases; Sustainability requirements for biomass for energy; Green restructuring of the industry; and Transition to market-driven expansion of solar cells and onshore wind. The so-called mill ceiling (maximum of 1,850 onshore wind turbines) will be postponed from 2030 to 2040 and CfD tenders for new onshore turbines and solar will be launched in 2020 and 2021. In total, the agreement between the government and the Left, DF, Radical Left, SF, the Unity List, Conservatives, Liberal Alliance and the Alternative, together with the climate agreement for waste, results in CO2e reductions of DKK 3.4 million tonnes by 2030.
Location:
Denmark
Status:
Development Zone
Capacity:
4C Offshore | Location Map: Lat(56.281) Lon(6.830)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
56.280824°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life