Floatgen Project Floating Wind Farm

04 Jun 2021: Lhyfe and Centrale Nantes, in collaboration with Chantiers de l’Atlantique, aim yo demonstrate an offshore hydrogen electrolyser at the SEM-REV site from 2022. The electrolyser will be installed on GEPS Techno’s floating platform and connected to the various sources of Marine Renewable Energy (MRE) available on the offshore test site, including the Floatgen floating wind turbine. The offshore test site meets all the criteria (MRE presence, harsh environmental conditions) to validate offshore hydrogen production technology before moving towards large-scale industrial deployment in 2024. Lhyfe and the Chantiers de l’Atlantique have been working closely since 2020 on the detailed design of an offshore hydrogen production platform that can be built in Saint Nazaire, ranging from ten MW to several hundred MW. The aim is to deploy these concepts as early as 2024.
Location:
France
Status:
Fully Commissioned
Capacity:
2 MW
4C Offshore | Location Map: Lat(47.240) Lon(-2.775)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Atlantic Ocean
Latitude
47.240302°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life