4C Offshore Empowering Intelligence

Fujian Pingtan Datang Changjiangao Offshore Wind Farm

29 Jun 2023: Updates on June: All 15 wind turbines under construction at the project were connected to the grid to generate electricity. 27/04/2023:Datang Fujian Pingtan Company Successfully Connects No. 16 Wind Turbine of Changjiang'ao Offshore Wind Power Project to the Grid.
Location:
China
Status:
Fully Commissioned
Capacity:
75 MW
4C Offshore | Location Map: Lat(25.622) Lon(119.847)

Subscribers can track wind farms on their dashboard.

General Information
Name
Fujian Pingtan Datang Changjiangao
Other Names
平潭长江澳海上风电场项目 福建大唐国际平潭长江澳185MW海上风电场
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Fujian Pingtan Datang Sea Wind Power Co.,Ltd. (福建平潭大唐海上风电有限责任公司)

Fujian Pingtan Datang Sea Wind Power Co.,Ltd. (福建平潭大唐海上风电有限责任公司)

Owner

Datang International Power Generation Co., Ltd. (大唐国际发电股份有限公司)

Datang International Power Generation Co., Ltd. (大唐国际发电股份有限公司)

Owner

Pingtan Comprehensive Experimental Zone Transportation Investment Group Co., Ltd (平潭综合实验区交通投资集团有限公司)

Pingtan Comprehensive Experimental Zone Transportation Investment Group Co., Ltd (平潭综合实验区交通投资集团有限公司)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
75 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Eastern China Sea
Latitude
25.621872°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life