ArkonaSee Ost Offshore Wind Farm

Status:
Cancelled
Capacity:
320 MW
Location:
Germany

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
ArkonaSee Ost
Other names
Country
Germany
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
Owner-Offshore Transmission

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field
Revenue (MWh)
Revenue (EUR/MWh)

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
08 Jun 2016: The Federal Maritime and Hydrographic Agency (BSH) has received a planning application for project, however the BSH has expressed its intention to not grant any further authorisations until the 16th June 2018 under the extension and amendment of the latest development freeze. Only those projects granted approval according to Section 2 of the Marine Facilities Ordinance (SeeAnIV), or those that have held a hearing for the project's application according to the Marine Facilities Ordinance (SeeAnIV), and located in North Sea Cluster 1-8 or Baltic Sea Cluster 1-3 will be considered for the transitional tender rounds scheduled for 2017 and 2018. A project could also be a contender if it is located in the 12nm zone and has been awarded the final construction permit according to §4 of the Federal Pollution Control Act. Therefore the project is not expected to progress in current form, as a central auctioning concept will be used to allocate projects in the future.
Power & Turbines
Windfarm capacity
320 MW
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Subscribers only field
Foundations on Wind Farm
Subscribers only field
Foundation comments

Location & Environment
Sea name
Baltic Sea
Latitude
54.864°
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Number of export cables (DC)
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Expected life
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore