Status:
Development Zone
Capacity:
1000 MW
Location:
Germany

Subscribers can track wind farms on their dashboard



General Information
Name
N-11-2
Country
Germany
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
19 Jun 2020: On 19th June the Federal Maritime and Hydrographic Agency (BSH) published the first update to its Area Development Plan (FEP) following the increase on offshore wind targets to 20 GW by 2030 and 50 GW by 2040. The FEP provides the framework for the spatial and temporal development of offshore wind farms in the North and Baltic Seas. It also defines how and when these areas should be connected to the onshore power grid. The draft FEP includes plans for tenders for to be launched from 2021-2025 with commissioning from 2026-2030. Planned areas include N-3, N-6, N-7, N-9 and N-10, in the North Sea and O-1.3 in the Baltic Sea with a total targeted capacity of 9.688 GW. Timeline considers 1 GW to be tendered per year from 2021-2023, 3 GW in 2024 and 4 GW in 2025. The FEP also incorporates plans for post-2030 with areas in N-11, N-12 and N-13 totalling ~10 GW to be tendered after 2025 and built after 2030. The FEP specifies standardised technology and planning principles for the associated connection systems. This includes the use of 66 kV direct connection between the turbine array and the converter platform which eliminates the need for a substation and intermediate 155 kV HVAC cables. From 2029 a new connection concept will also be used which includes 525 kV HVDC cables and transmission capacity of 2 GW per cable system. This will be more space efficient and reduce environmental impacts. Compared to the representation in FEP 2019, areas N-9 to N-13 in this preliminary draft have been enlarged. In area N-9, four areas of approximately the same size are defined as part of this plan and two areas in N-10. The entire area of N-10.2 is not fully required to meet 20 GW by 2030 target. Areas N-4 are under review with a view to possible subsequent use but not included in currents plans due to conflicts of use. Area N-5, some sites considered for later expansion but generally less favourable. Particularly areas N-5.4 due to environmental and conservation issues. N-8 is considered spatially difficult and inefficient. Southern areas within O-1 have conflicts of use. Area O-2.2 is in question but has conflicts of use with shipping areas. The development of the open spaces in area O-6 could result in additional potential for post 2030. However, this is subject to the actual availability of the space. Spatial descriptions of the converter platforms in areas N-3 to N-7 and the transformer platforms in areas O-1 and O-2 are unchanged. Compared to the FEP 2019, the platform NOR-3-2 was moved about 1.3 km to the north. It is now considered feasible and cost efficient to use 66 kV direct connection concept for N-6 as well based on further studies. A 66 kV development is also planned for area N-9. The converter platform NOR-9-1 is planned in the middle between the surfaces N-9.1 and N-9.2. The NOR- 9-2 converter platform opens up and is centered between the surfaces N-9.3 and N-9.4. In area N-10, a converter platform, NOR-10-1, is planned in the middle between N-10.1 and N-10.2. To connect areas in N-11 to N-13 after 2030 would require the construction of five additional offshore networks (NOR 12-1, NOR 12-2, NOR 11-1, NOR 11-2, NOR 13-1) For the first time, the BSH is also providing so-called other energy production areas for consultation in the preliminary draft submitted. In these areas, innovative forms of energy generation, for example for hydrogen production without connection to the public power grid, are to be tested. Two areas in zones 1 and 2 have also been reserved for other energy generation these include SEN-1 (approx. 28.8 km²) in zone 2 of north sea and SEO-1 (approx. 7.8 km²) in Baltic Sea. The other energy production area SEO-1 is under review due to possible usage conflicts with regard to nature conservation issues, especially bird migration. A consultation on the draft documents will now be held until 20th July and a final version of the FEP is expected to be ready by the end of the year.
Power & Turbines
Windfarm capacity
1000 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea
Latitude
54.782205°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2020

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore