17 Dec 2021: The BSH published an update to the Area Development Plan (FEP) in late 2021 to reflect the revised offshore wind targets for 30 GW by 2030 and 40 GW by 2035 and 70 GW by 2045. The FEP identifies priority and reservation areas for offshore wind energy for up to 43 GW, increasing the total identified potential to 57.5 GW. The FEP includes reconfigured designs of areas in Zone 3 and identified new areas in Zones 4 and 5 of the German North Sea as well as 1 GW in the Baltic Sea. In some of these areas, power density has been increased compared to the FEP 2020, up to a maximum of 11 MW/km2, allowing for extra 3 GW across N-9 to N-13. The FEP does not yet include specific tendering and commissioning years. There is uncertainty with regard to the acceleration potential of the network connections. Following consultation, a further draft FEP is expected in mid-2022.
Location:
Germany
Status:
Development Zone
Capacity:
1500 MW
4C Offshore | Location Map: Lat(54.861) Lon(6.370)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.860998°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life