General Information Converter/Collector Name BorWin5 Converter correct
Status Planned correct
Latitude 54.317 ° correct
Longitude 6.285 ° correct
Comments Tender expired 7th December.

According to the 2014 draft of the Offshore Network Development Plan, the converter is currently preparing its application to submit for consent approval.

The project will connect at Cloppenburg.
correct
Foundation Foundation Type Grounded: correct
Foundation Weight correct
Foundation Comments correct
Topside Topside Weight correct
Topside Dimensions (LxWxH) correct
Helideck correct
Electrical Specifications Power 900 MW correct
DC Voltage Level correct
AC Voltage Level correct
Number of Transformers correct
Other Equipment correct
Transmission Cable Cable Name BorWin5 Converter cable correct
Number of Transmission Cables 2 correct
Minimum Cable Length 125 km correct
Depth Buried correct
Nominal Voltage correct
Conductor Type correct
Section correct
Insulation correct
Cost of the Transmission Cable correct
Cost Description correct
Comments on the Transmission Cable The route traverses from the EEZ to the Territorial Sea through Gate III. The total on and offshore length is 230km, with grid connection point in Unterweser. correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US
Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/transmission/converter-details.aspx?cid=96.