4C Offshore Empowering Intelligence
11 Jan 2023: Codling Wind Park launched second round of public consultation from 11 January to 8 February. Online virtual exhibition available and new maps. Also there will be public exhibitions. Updates since the last consultation: • conducted offshore site investigation works and characterisation surveys on the wind farm site and along the proposed cable route corridors; • selected Wicklow Port as the preferred location for the Operations and Maintenance base (OMB); • grown the size of the project team to approximately 60 full-time people, across a range of disciplines and areas of expertise; • continued our engagement with a wide range of stakeholders across the communities closest to the project and initiated monthly information clinics at three locations in Wicklow; • engaged with a wide range of statutory and non-statutory consultees on our environmental assessment plans.. prepare to participate in the first government Offshore Renewable Electricity Support Scheme (ORESS) prepare to submit the development permission application later this year. - Grid Connection Assessment: Following detailed engagement with EirGrid over a period of 24 months, in November 2022, Poolbeg was formally confirmed by EirGrid as the location for the grid connection. The maximum export capacity (MEC) was also confirmed at 1,450 MW. - MAC: Maritime Area Consent. In June of 2022, Codling Wind Park applied to the Government for a Maritime Area Consent (MAC). - In October 2022 received notification from the Minister for the Environment, Climate and Communications that the application was successful. Surveys and environmental studies: ornithology has been ongoing for many years. Onshore, has also commenced other surveys including habitat (flora and fauna), protected species, geotechnical, baseline noise and archaeological surveys. Offshore, a number of studies and surveys – geophysical, geotechnical, ecological and metocean – have been undertaken in recent years.
Location:
Ireland
Status:
Concept/Early Planning
Capacity:
1300 MW
4C Offshore | Location Map: Lat(53.068) Lon(-5.783)

Subscribers can track wind farms on their dashboard.

General Information
Name
Codling
Other Names
Codling Wind Park
Country
Ireland
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Codling Wind Park Ltd

Codling Wind Park Ltd

Owner

EDF Energies Nouvelles Group

EDF Energies Nouvelles Group

Owner

Fred. Olsen Renewables Ltd

Fred. Olsen Renewables Ltd


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1300 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Irish Sea
Latitude
53.068248°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
3
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life