Avventura Floating Wind Farm

24 May 2022: In June 2009, the project was awarded a maritime concession for a fixed-bottom offshore wind project with 38 turbines of 6 MW. Following the negative opinion expressed by the Technical Commission for Environmental Impact Assessment Parare CTVIA n. 640 of 18 February 2011, C&C Consulting engineering srl, meanwhile taking over as owner of 4 Wind srl following its merger by incorporation, decided to revise the project proposal. On May 24th 2022, an application for single authorisation was submitted for: semi-submersible floating foundations, 12 turbines with 19 MW capacity. The project will have the same capacity as before of 228 MW, but relocated to 120 - 150 m water depth with gravity based anchors weighing 60 tonnes.
Location:
Italy
Status:
Consent Application Submitted
Capacity:
228 MW
4C Offshore | Location Map: Lat(37.348) Lon(12.212)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
228 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Mediterranean Sea
Latitude
37.348475°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life