Kailia Energia A-B e C-D Floating Wind Farm

06 Oct 2021: SIA content definition (scoping) submitted for a 1176 MW wind farm at a minimum distance of 9 km from the north-eastern coast of the Puglia Region between the cities of Brindisi (BR) and San Cataldo LE). The landing point of the cable duct is planned near the Cerano (BR) power plant. The wind farm will have 98 turbines of 12 MW capacity, facing the north-eastern coast of the Puglia Region, in particular in the stretch of sea approximately between City of Brindisi (Province of Brindisi) and San Cataldo (Municipality of Lecce, Province of Lecce) at distances between 8.7 km (minimum distance from the coast) and 21.9 km and depths between -70 m and -125 m approximately. The wind farm will be connected to the shore power grid through a series of submarine cables that will connect to the underground conduit to reach the onshore power station located in the municipality of Brindisi south of Torre Mattarelle and near the Cerano thermoelectric plant. Date of receipt of document completion is 26/10/2021.
Location:
Italy
Status:
Concept/Early Planning
Capacity:
1176 MW
4C Offshore | Location Map: Lat(40.555) Lon(18.328)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1176 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Strait of Otranto
Latitude
40.554879°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life