Ishikari Bay New Port Offshore Wind Farm

01 Jan 2024: January 2024: Commercial operation began on 1st January 2024. December 2023: the wind farm is gearing up towards full-scale operation. As of 4 December 2023, commercial operation will begin on 1 January 2024. Update (15 June 2022): project is currently aiming for commercial operations in December 2023. Update (July 2021): project is scheduled to start operation in 2023, according to a 2019 report. Update (17/12/2019): Full commission is expected in Q4 2022 Update in (01/11/2019): Hokkaido Electric Power Company (HEPCO) signed a cooperation agreement with Japan’s Green Power Investment (GPI) Corporation. Meanwhile, HEPCO and GPI will continue to discuss details of the collaboration. Completion is expected in 2022.
Location:
Japan
Status:
Fully Commissioned
Capacity:
112 MW
4C Offshore | Location Map: Lat(43.211) Lon(141.257)

Subscribers can track wind farms on their dashboard.

General Information
Name
Ishikari Bay New Port
Other Names
石狩湾新港洋上風力発電事業; 石狩湾新港; Ishikari Bay New Port; Ishikari Offshore Wind Farm
Country
Japan
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Green Power Ishikari LLC (合同会社グリーンパワー石狩)

Green Power Ishikari LLC (合同会社グリーンパワー石狩)

Developer

Kajima Corporation (鹿島建設株式会社)

Kajima Corporation (鹿島建設株式会社)

EPC(I)-Balance of Plant

Shimizu Corporation and Nippon Steel Engineering JV

Shimizu Corporation and Nippon Steel Engineering JV

Operator

Green Power Ishikari LLC (合同会社グリーンパワー石狩)

Green Power Ishikari LLC (合同会社グリーンパワー石狩)

Operator-Offshore Transmission

Hokkaido Electric Power Company (HEPCO) 北海道电力

Hokkaido Electric Power Company (HEPCO) 北海道电力

Owner

Green Power Investment Corporation(株式会社グリーンパワーインベストメント)

Green Power Investment Corporation(株式会社グリーンパワーインベストメント)

Owner-Offshore Transmission

Hokkaido Electric Power Company (HEPCO) 北海道电力

Hokkaido Electric Power Company (HEPCO) 北海道电力


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
JPY 36000/MWh (EUR 227.33/MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
112 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Japan Sea
Latitude
43.211033°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life