TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

nCentric connect wind farm

4C Offshore | Matthew White
By: Matthew White 03/07/2018 nCentric
nCentricnCentric was chosen by Senvion- Elpix AG to provide the Nordsee Ost offshore wind farm, as well as the vessels working on the array, with a minimum of 20Mbps internet connection.

“With our nCentric solutions and using our latest Mesh development nCentric succeeded to do so”, Marc Vereecken, Sales Manager nCentric said.

The 20Mbps connection speed allows for faster communications between vessels and the onshore base of operations. Alongside this, the time delay on data transference is reduced.

The
Nordsee Ost wind farm comprises 48 6MW wind turbines installed approximately 35km north of the island of Heligoland and produces 295MW output. Senvion was responsible for the operation and maintenance of the WTGs in the first five years of operation, with options to extend the contract.

For more information follow the links provided.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!