03 Sep 2021: The first of NnG’s two offshore substation topsides was recently loaded onto the barge ’Louis’ by the GE-HSM consortium at HSM’s yard in Schiedam, near Rotterdam, in the Netherlands. The second topside is scheduled for loadout this coming week. Each of the topsides is 35m long, 18m wide and 15m high and weighs less than 1,000 tonnes. The topsides will arrive at the NnG site later this year where they will be installed onto each foundation jacket substructure. Each offshore export cable will then be installed, completing the installation of the offshore substations. 
Location:
United Kingdom
Status:
Under Construction
Capacity:
448 MW
4C Offshore | Location Map: Lat(56.268) Lon(-2.250)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
448 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Upgrade your subscription to include Wind Farms
Min. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Max. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Upgrade your subscription to include Wind Farms or Cable
Total Turbine Height
Upgrade your subscription to include Wind Farms
Hub Height
Upgrade your subscription to include Wind Farms
Rotor Diameter
Upgrade your subscription to include Wind Farms
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable
Foundation Comments
Upgrade your subscription to include Wind Farms

Location & Environment
Sea Name
North Sea, Northern North Sea (Forth)
Latitude
56.267679°
Longitude
Upgrade your subscription to include Wind Farms or Cable
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Upgrade your subscription to include Wind Farms or Cable
Depth Range (Stated by Developer)
Upgrade your subscription to include Wind Farms or Cable
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)
Upgrade your subscription to include Wind Farms or Cable

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Upgrade your subscription to include Wind Farms or Cable
Grid Connection Point
Unlock with a freemium account
Cable Landing Point
Upgrade your subscription to include Wind Farms or Cable

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Upgrade your subscription to include Wind Farms or Cable
Additional Requirements (AC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (AC)
Upgrade your subscription to include Wind Farms or Cable
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (DC)
Upgrade your subscription to include Wind Farms or Cable

Nominal Voltage
Upgrade your subscription to include Wind Farms or Cable
Comments
Upgrade your subscription to include Wind Farms or Cable

Onshore Cables
Number of Onshore Cables
4
Average Length per Cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable
Expected Life
Upgrade your subscription to include Wind Farms