18 Mar 2022: On Friday 18 March 2022, the North Sea 2022-2027 Program was adopted as part of the National Water Program 2022-2027(refers to another website)(NWP). Wind energy areas have been designated in the North Sea Program that are necessary for the realization of 10.7 GW extra wind energy, in line with the cabinet's climate targets of at least 55% CO2 reduction by 2030. The extra capacity will result in 21 GW operational around 2030. The government proposes to use the Climate Fund to pay for part of the expenditure. This concerns an amount of €1.69 billion. The three new wind energy areas (WEA) have been given the following names: Nederwiek (WEA 1), Lagelander (WEA 2), Doordewind (WEA 5-oost). The other two reconfirmed areas are the northern part of IJmuiden Ver (V & VI) and the southern part of Hollandse Kust West (VIII). The names of the new areas were chosen in a naming competition, in which almost 6000 people participated. Further details regarding windfarm locations with the designated areas and timings will be outlined in the Roadmap 2030+, expected Summer 2022.
Location:
Netherlands
Status:
Development Zone
Capacity:
1000 MW
4C Offshore | Location Map: Lat(53.062) Lon(3.652)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
53.061741°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life