Netherlands 14MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Haliade-X 12-14MW Prototype - Maasvlakte (Onshore)

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Installation The nacelle has been installed... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The nacelle of the Haliade-X 12MW offshore wind tu... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The first blade was loaded out of the factory in C... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication All tower sections have arrived at the Port of Rot... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication LM Wind Power have produced the first blade for th... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Installation Update 17/10/2019: The third blade has been instal... Subscribers only field Subscribers only field
Freemium Only 2019 Cable installation Visser & Smit Hanab completed cable-laying to conn... Subscribers only field Subscribers only field
Freemium Only 2018 Other Application Submitted Environmental permit application material, for tur... Subscribers only field Subscribers only field
Freemium Only 2019 GE Renewable Energy and Future Wind (a Joint Ventu... Subscribers only field Subscribers only field
Freemium Only 2018 Other Approval  Municipality of Rotterdam announce that they inte... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The first LM Wind Power LM 107.0 P blade for the 1... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The Haliade-X nacelle departed from Saint-Nazaire... Subscribers only field Subscribers only field
Freemium Only 2019 Fully Commissioned Haliade-X entered operations today. The GE team is... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The Haliade X 12 MW is currently undergoing assemb... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The first turbine was shipped out from Seville to ... Subscribers only field Subscribers only field
Freemium Only 2019 Other The measurement mast next to the Haliade X has bee... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Fabrication The first blade has arrived at Maasvlakte and is p... Subscribers only field Subscribers only field
Freemium Only 2019 Generating Power The Haliade-X wind turbine generated its first kwh... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Installation The first Haliade-X 12 MW wind turbine prototype w... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Installation Tower segments 0, 1, and 2 have been installed. T3... Subscribers only field Subscribers only field