Karmøy - Marine Energy Test Centre(Metcentre) - Floating Offshore Wind Farm

Status:
Fully Commissioned
Capacity:
10 MW
Location:
Norway

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Karmøy - Marine Energy Test Centre(Metcentre) - Floating
Other names
Demonstrasjonsanlegg for offshore vindkraft utenfor Karmøy (bunnfast)
Country
Norway
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation
Owner (1.33% stake)
Owner (1.34% stake)
Owner (1.33% stake)

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
05 Aug 2019: The Makani kite undertook its first two autonomous test flights at the METCENTRE. The first flight included launch, hover away from the perch, and an autonomous landing. The second, longer-duration test, demonstrated robust crosswind flight. The kite accurately followed commands from the flight controller, affirming that its motion and that of the floating platform matched pre-test simulations. In preparation for landing, the kite smoothly transitioned out of crosswind into a stable hover. However, it did not successfully land on the platform, and the flight ended with the loss of the energy kite. The Makani team is now working on making improvements.The airframe was transported on a flatbed trailer, the kite was lifted onto its perch using a mobile boom crane (commonly available) and in one operation towed to site using two coastal tug boats. The kite and spar is installed at a water depth of 220m. Installation was first planned to take place in June but was delayed.
Power & Turbines
Windfarm capacity
10 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
North Sea
Latitude
59.149°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field

Copyright © 4C Offshore 2019