Latest event on Ormonde

Brave Tern scheduled to arrive on site to carry out component exchange at turbine positions A06, A07, C07. Work is expected to last 2/3 days per turbine and to be completed by 7th May. Read more

Latest Update: 26 April 2018

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
RoleOrganisation 
Developer
correct
Operator
Ormonde Energy Limited
correct
Owner
AMF Pensionsförsäkring AB
correct
Owner correct
Owner-Offshore Transmission correct
Project Details for Ormonde
General Information Name Ormonde correct
Other names correct
Country name United Kingdom correct
Region England, North West correct
Comments Gas field production licence handed back to DECC as it was not economically viable. correct
Round (or category) Gas-Wind Hybrid correct
Development status Fully Commissioned correct
Power & Turbines Project capacity 150 MW correct
Turbine model 5M (Senvion) correct
Turbine capacity 5.075 MW correct
Number of turbines 30 correct
Total turbine height 153 m correct
Hub height 90.00 m correct
Rotor diameter 126 m correct
Foundation Grounded: Jacket (Piled) correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost EUR(mill) 552.00 correct
Location & Environment Sea name Irish Sea correct
Centre latitude 54.088° correct
Centre longitude -3.437° correct
Area 10 km2 correct
Depth range (Chart Datum) 17 m - 21 m correct
Depth range stated by developer 17 m - 22 m correct
Distance from shore (reported) 9.5 km correct
Distance from shore (computed from centre) 12.3 km correct
Ports Installation base Belfast correct
Ops and maintenance Barrow correct
Grid Converter/Collector platforms None correct
Offshore transformers Ormonde Substation correct
Grid connection point Heysham correct
Cable landing point North of Heysham Port in Half Moon Bay correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 1 correct
Average length per cable 42 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 132 kV correct
Maximum voltage correct
Power rating 158 MVA correct
Number of cores 3 correct
Conductor type correct
Section area 800 mm2 correct
Insulation correct
Number fibre optics 24 correct
Export minimum bend radius (MBR) 3 m correct
Burial depth 2 m correct
Comments £32m has been spent on export cable supply and installation correct
Onshore Cables Number of onshore cables 3 correct
Average length per cable 2.8 km correct
Comments 3 underground single core cables, 132kV, 157MVA. Buried to a depth of 0.9m. correct
Array Cables Array cable length 27 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth 0.6 m correct
Number of cores 3 correct
Conductor type correct
Section 150/300/500 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics 24 correct
Minimum bend radius (MBR) correct
Comments Prysmian 33kV submarine composite cables - (3x 500m2)(3x300m2)(3x150mm2) correct
Benefits Homes powered annually 106238 correct
CO2 reduced per year 214708 tonnes correct
SO2 reduced per year 4993 tonnes correct
Expected life 25.0 years correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Burbo Bank Extension Burbo Bank Extension
Fully Commissioned Dudgeon Dudgeon
Fully Commissioned Galloper Galloper
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Race Bank Race Bank
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Partial Generation/Under Construction Rampion Rampion
Partial Generation/Under Construction Walney Extension Walney Extension
Under Construction Beatrice Beatrice
Under Construction East Anglia ONE East Anglia ONE
Under Construction Hornsea Project One Hornsea Project One
Pre-Construction Hornsea Project Two Hornsea Project Two
Pre-Construction Kincardine Offshore Windfarm Project Kincardine Offshore Windfarm Project
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=uk17.