Latest event on Parc éolien en mer de Fécamp

The Developer is seeking four separate companies for environmental monitoring services with regards to:
a/megafauna
b/water quality and sediment
c/ acoustics
d/shellfish and crustaceans.
The application deadline is 1st July.
Read more

Latest Update: 21 June 2018

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
Project Details for Parc éolien en mer de Fécamp
General Information Name Parc éolien en mer de Fécamp correct
Other names Eoliennes Offshore des Hautes Falaises offshore wind farm correct
Country name France correct
Region Normandie correct
Comments correct
Round (or category) Round 1 (2011) correct
Development status Consent Authorised correct
Power & Turbines Project capacity 498 MW correct
Turbine model Haliade 150-6MW (GE Energy) correct
Turbine capacity 6 MW correct
Number of turbines 83 correct
Total turbine height 175 m correct
Hub height 100.00 m correct
Rotor diameter 150 m correct
Foundation Grounded: Gravity-Base (A demonstration foundation by Seatower has been installed. The developers of the Fécamp offshore wind farm have chosen to demonstrate and install Seatower’s patented Cranefree Gravity foundation design.) correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost EUR(mill) 2000.00 correct
Location & Environment Sea name English Channel correct
Centre latitude 49.892° correct
Centre longitude 0.227° correct
Area 88 km2 correct
Depth range (Chart Datum) 25 m - 31 m correct
Depth range stated by developer 24 m - 31 m correct
Distance from shore (reported) 13 km correct
Distance from shore (computed from centre) 17.2 km correct
Ports Installation base Le Havre correct
Ops and maintenance Fécamp peninsular correct
Grid Converter/Collector platforms None correct
Offshore transformers Hautes Falaises Substation correct
Grid connection point Sainneville correct
Cable landing point Poste de Pont-Sept correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 2 correct
Average length per cable 17.5 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 220 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables 6 correct
Average length per cable 31 km correct
Comments 225kV, it consists of two three-core cables with synthetic insulation, trenched to 1.5m in a trench also 1.5m wide correct
Array Cables Array cable length 134 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 33 kV correct
Maximum voltage 34 kV correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 352711 correct
CO2 reduced per year 712829 tonnes correct
SO2 reduced per year 16577 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
StatusName
Decommissioned Nénuphar Vertifloat (onshore) Nénuphar Vertifloat (onshore)
Fully Commissioned EOLINK 1/10 scale prototype - THeoREM offshore test site EOLINK 1/10 scale prototype - THeoREM offshore test site
Fully Commissioned Nénuphar VERTIWIND (onshore) Nénuphar VERTIWIND (onshore)
Fully Commissioned SEM-REV - SITE D'EXPERIMENTATION EN MER - MARINE TEST SITE SEM-REV - SITE D'EXPERIMENTATION EN MER - MARINE TEST SITE
Under Construction Floatgen Project Floatgen Project
Consent Authorised Eoliennes Offshore du Calvados project Eoliennes Offshore du Calvados project
Consent Authorised Nénuphar test site - MISTRAL - Golfe de Fos Nénuphar test site - MISTRAL - Golfe de Fos
Consent Authorised Parc éolien en mer de Fécamp Parc éolien en mer de Fécamp
Consent Authorised Projet de parc éolien en mer de Saint-Nazaire Projet de parc éolien en mer de Saint-Nazaire
Consent Authorised Projet éolien en mer de la Baie de Saint-Brieuc Projet éolien en mer de la Baie de Saint-Brieuc
Consent Application Submitted Les éoliennes flottantes de Groix & Belle-Île Les éoliennes flottantes de Groix & Belle-Île
Consent Application Submitted Parc des Iles d’Yeu et de Noirmoutier Parc des Iles d’Yeu et de Noirmoutier
Consent Application Submitted Parc éolien en mer de Dieppe - Le Tréport Parc éolien en mer de Dieppe - Le Tréport
Concept/Early Planning EolMed EolMed
Concept/Early Planning EolMed - Ideol & Quadran Commercial Scale Floating Project EolMed - Ideol & Quadran Commercial Scale Floating Project
Concept/Early Planning Les éoliennes flottantes de Provence Grand Large Les éoliennes flottantes de Provence Grand Large
Concept/Early Planning Les éoliennes flottantes du Golfe du Lion Les éoliennes flottantes du Golfe du Lion
Concept/Early Planning Spinfloat Demonstrator Spinfloat Demonstrator
Development Zone Future Commercial Floating Tenders Future Commercial Floating Tenders
Development Zone Future Fixed-Bottom Tenders Future Fixed-Bottom Tenders
Development Zone L’éolien en mer région Dunkerque (troisième appel d’offres) L’éolien en mer région Dunkerque (troisième appel d’offres)
Development Zone Parc éolien en mer d'Oléron Parc éolien en mer d'Oléron
Dormant Parc Eolien en mer Boulogne Grand Large Parc Eolien en mer Boulogne Grand Large
Cancelled InFLOW (INdustrialization setup of a FLoating Offshore Wind turbine) InFLOW (INdustrialization setup of a FLoating Offshore Wind turbine)
Cancelled Nénuphar - large scale prototype Nénuphar - large scale prototype
Cancelled Nénuphar TWINFLOAT - pilot wind farm (VertiMED) Nénuphar TWINFLOAT - pilot wind farm (VertiMED)
Cancelled WIN 2 - Phase 1 WIN 2 - Phase 1
Cancelled WIN 2 - Phase 2 WIN 2 - Phase 2
Cancelled WIN 2 - Phase 3 WIN 2 - Phase 3
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=fr34.