Bałtyk II Offshore Wind Farm

15 Nov 2021: Invitation to tender for the construction of Sea Export Cables EPCI (Engineering, Procurement, Construction and Installation) for (Baltyk2 and Baltyk3) covers the supply and installation of 4 x 3-core XLPE 220 kV submarine export cables with accessories and equipment with a total transmission capacity of 1.44 GW ( 360 MW each). The scope of EPCI works for Sea Export Cables includes the following main activities:  -Initial concept -Technical design and documentation -Coordination of interfaces -Orders, production and testing -Loading, transport -Storage and maintenance -Cable production, installation and protection, including pull-in, termination and bonding of cables at the offshore transformer station and the landfall area -Mechanical termination -Final documentation -Activities related to contract closure required for the issue of the Certificate of Completion Dialogue schedule -Announcement on the intention to hold a Dialogue ("Announcements") - 15.11.2021 -End of the collection of applications for the Dialogue - 15/12/2021 -Qualification of suppliers' applications - up to 3 days from the end of collecting applications -Dialogue with suppliers - up to 3 days from completing the qualification of suppliers' applications -Sending an invitation to tender to selected participants of the Dialogue - mid December 2021. -Award of the contract - June 2022
Location:
Poland
Status:
Concept/Early Planning
Capacity:
720 MW
4C Offshore | Location Map: Lat(55.083) Lon(16.883)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
720 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
55.083321°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life