Jeonnam Sinan Phase 1 - POSCO Offshore Wind Farm

07 Nov 2023: The second public-private council meeting was held to discuss grid connection, profit sharing and to collect residents opinions. Resident hearings will continue until 20/11/2023 and the final draft of the business plan is expected to be submitted to the Ministry of Trade, Industry and Energy in December.
Location:
South Korea
Status:
Concept/Early Planning
Capacity:
300 MW
4C Offshore | Location Map: Lat(34.810) Lon(125.728)

Subscribers can track wind farms on their dashboard.

General Information
Name
Jeonnam Sinan Phase 1 - POSCO
Other Names
전남해상 풍력300MW; 전남 5GW 해상풍력발전; 전남신안해상 풍력 1단계 Jeonnam Offshore Windfarm; Shinan; Sinan 8.2 GW
Country
South Korea
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Jeonnam Wind Power Association

Jeonnam Wind Power Association

Operator

KOEN - Korea South East Power Co., Ltd (KOSEP) - 한국남동발전

KOEN - Korea South East Power Co., Ltd (KOSEP) - 한국남동발전

Operator

Posco Energy (포스코에너지)

Posco Energy (포스코에너지)

Owner

KOEN - Korea South East Power Co., Ltd (KOSEP) - 한국남동발전

KOEN - Korea South East Power Co., Ltd (KOSEP) - 한국남동발전

Owner

Posco Energy (포스코에너지)

Posco Energy (포스코에너지)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
300 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Yellow Sea
Latitude
34.849985°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life