Canawind 2 Floating Wind Farm

01 Aug 2022: Update September 2022: Documentation is now available to public. This includes locations and Initial Project Documents (DIP). Canawind I will have a total capacity of 250 MW, consisting of 17 SG14-222 DD turbines with a nomial power of 14 MW, repowered to 14.7 MW, with an annual production of 957 GWh/year. Wind data prepared by the ITC shows speeds of 9.5 m/s for this area, and water depth is 130 - 400m. Two projects have submitted environmental documentation to MITECO, Canawind I and Canawind II. Both projects are 250 MW, located in Gran Canaria. The documentation is not available to the public yet.
Location:
Spain
Status:
Concept/Early Planning
Capacity:
250 MW
4C Offshore | Location Map: Lat(27.800) Lon(-15.302)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
250 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Atlantic Ocean
Latitude
27.799614°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life