Sweden 110.4MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Lillgrund

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Turbine ALL NRG supported Vattenfall servicing the turbine... Subscribers only field Subscribers only field
Freemium Only 2019 From 1 January 2019 onwards, Coca-Cola European Pa... Subscribers only field Subscribers only field
Freemium Only 2018 Met Mast/LiDAR Vattenfall removed the met mast from the site.... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine SEA POWER was on site supporting turbine maintenan... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine SEA POWER arrived on site to provide heavy mainten... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable After seven weeks of not producing power the wind ... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable Weather permitting the plan is to start the export... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable A cable fault resulted in the site stopping operat... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine SEA ENERGY (now Excel) was on site supporting heav... Subscribers only field Subscribers only field
Freemium Only 2012 Turbine SEA ENERGY (now Excel)... Subscribers only field Subscribers only field
Freemium Only 2012 Turbine SEA ENERGY (now Excel) carried out heavy maintenan... Subscribers only field Subscribers only field
Freemium Only 2007 Fully Commissioned Started to generate power in December 2007.... Subscribers only field Subscribers only field
Freemium Only 2007 Turbine Installation Turbine installation finishes.... Subscribers only field Subscribers only field
Freemium Only 2007 Turbine Installation Turbine installation starts.... Subscribers only field Subscribers only field
Freemium Only 2007 Array Cable Installation The infield cables were installed during the summe... Subscribers only field Subscribers only field
Freemium Only 2007 Export Cable Installation The export cables were installed during the summer... Subscribers only field Subscribers only field
Freemium Only 2007 Offshore Substation Substation installation took place on the 17th Jun... Subscribers only field Subscribers only field
Freemium Only 2007 Array Cable Installation First infield cable was installed.... Subscribers only field Subscribers only field
Freemium Only 2007 Foundation Installation Finish installing the foundations.... Subscribers only field Subscribers only field
Freemium Only 2006 Foundation Installation Construction of the wind farm began with the insta... Subscribers only field Subscribers only field
Freemium Only 2003 Met Mast/LiDAR Installation of 65m high Met mast.
Met mast moved... Subscribers only field
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore