09 Apr 2022: Gwynt y mor is planning to conduct survey operations off the North Wales coast in the area between Rhyl and the Gwynt y Môr Offshore Wind Farm. The survey vessel Titan Endeavour will carry out survey operations around the export cable corridor route for seven days, starting on 15 April 2022.
Location:
United Kingdom
Status:
Fully Commissioned
Capacity:
576 MW
4C Offshore | Location Map: Lat(53.459) Lon(-3.584)

Subscribers can track wind farms on their dashboard.

General Information
Name
Gwynt y Môr
Other Names
Gwynt y Mor
Country
United Kingdom
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Comments
Website

Developers/Owners/Operators
Type
Organisation
Operator-Offshore Transmission
Owner-Offshore Transmission

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning

Revenue Mechanism
Revenue Details
Revenue
GBP 147.56/MWh (EUR 175.26/MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
576 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Irish Sea
Latitude
53.45882°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
12
Average Length per Cable
Comments
Expected Life