31 Aug 2021: Update (31st August 2021): Consultation and virtual exhibition opened on 31st August 2021, running to 11th October 2021.  The Awel y Môr team has today published the project’s Preliminary Environmental Information Report (PEIR) which contains detailed maps and plans, plus information on the project’s expected impacts and how they will be avoided, minimised and mitigated where possible. The team is inviting people to review this report (provided with a Non-Technical Summary suitable for all readers) and to share their feedback. Statutory consultation expected to take place Q3/Q4 2021. A Preliminary Environmental Impact Report (PEIR) will be produced for the formal Public Consultation in 2021, which will set out understanding of the baseline environment, the impacts the project may have and proposed mitigations. Following responses to that consultation developers will produce an Environmental Statement that details all the work conducted through the EIA process – this will form an important part of the applications for a DCO and Marine Licence.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1100 MW
4C Offshore | Location Map: Lat(53.464) Lon(-3.775)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1100 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Irish Sea
Latitude
53.463725°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
2
Average Length per Cable
Comments
Expected Life