Dogger Bank Tranche D Offshore Wind Farm

31 Mar 2014: From an Interim Management Statement released 22/01/2014 SSE stated that it will conduct a wide-ranging review of its offshore wind portfolio and it will report back at the end of the financial year (31/03/2014). There are a number of reasons for this; 1)SSE's capital and investment program will not invest as much from 2015 onwards than it did from 2010 to the current day. 2) Even after the UK's The Energy Act 2013 "The prospects for investment in generation assets in Great Britain are, however, not encouraging.". 3) Beatrice and Galloper did not make it into the UK governments list of provisionally affordable projects under the Final Investment Decision Enabling for Renewables.
Location:
United Kingdom
Status:
Cancelled
Capacity:
2400 MW
4C Offshore | Location Map: Lat(55.430) Lon(2.983)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2400 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea, Southern North Sea (Dogger)
Latitude
55.429733°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life