Hunterston Test Centre - Siemens 6MW (onshore) Offshore Wind Farm

26 Sep 2019: Update 26/09/19: Controlled demolition of the test wind turbine at Hunterston Construction Yard took place Thursday 26th September. Update (12th September 2019): The final turbine is due to be brought down via controlled explosion, weather permitting, on Thursday 19th September 2019. The site will then be fully decommissioned and handed over to landowner Peel Ports. Testing of the Mitsubishi turbine is scheduled to end in summer 2018, following this, the decommissioning process is set to commence in late summer with the expectation to have this work completed by winter 2018. Plans for the decommissioning of the Siemens’ turbine will be communicated over the coming months.
Location:
United Kingdom
Status:
Decommissioned
Capacity:
6 MW
4C Offshore | Location Map: Lat(55.736) Lon(-4.889)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
6 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Onshore
Latitude
55.736256°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life