INTOG - Innovation and Targeted Oil and Gas decarbonisation

01 Sep 2021: Floating wind is particularly suited to the deep waters in the vicinity of Scottish O&G infrastructure. The North Sea Transition deal outlined by government and industry in March 2021 outlines the potential of carbon capture and storage, power from shore and offshore wind as decarbonation options for brownfield and greenfield O&G sites. The consultation is proposing a 4GW total development cap for O&G transition projects, which includes allowances for attrition and changes in site power density during development. The process will differ from ScotWind however; developers will be able to apply for sites during the INTOG SMP process rather than awaiting completion. Note that any sites included in the final plan will still require necessary consents. Proposed projects should be either; I. <100 MW test and demonstration projects. Up to 500MW of innovation or test and demonstration projects, which must be <100MW in size, will be awarded. Proposals can be outside the Areas of Search but must not be located within the areas marked as prohibited II. >100 MW O&G transition projects. Up to 4GW of O&G transition projects will be awarded, in alignment with the estimated current and future O&G demands. O&G projects may be >100MW and must provide electricity to decarbonise the platform, or O&G production. Production of hydrogen or e-fuels may be a component but cannot be the primary purpose.
Location:
United Kingdom
Status:
Development Zone
Capacity:
4500 MW
4C Offshore | Location Map: Lat(59.541) Lon(1.428)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
4500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
59.54076°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life