27 Jul 2021: 300MW of new projects, identified through The Crown Estate’s Test and Demonstration leasing opportunity, have been given the green light to progress to the next stage of assessment. The three projects are: - The 100MW Whitecross project, located off the coast of Devon and Cornwall. Brought forward by Offshore Wind Limited, a Joint Venture between Cobra Instalaciones y Servicios, S.A. and Flotation Energy plc. - The Llŷr 1 and Llŷr 2 projects, comprising two separate 100MW sites, in waters of between 60 and 70m deep, each testing different technologies, located south of Pembroke, on the Welsh coast. Developed by Floventis Energy Limited, a newly established joint venture between SBM Offshore and Cierco Ltd. The three projects have satisfied the initial application criteria set out by The Crown Estate. The projects will be subject to plan-level Habitats Regulations Assessment (HRA) and then granted seabed agreements for lease. Projects can then progress with environmental assessments and surveys in line with the regulatory consent processes. The three projects would each test new foundation and mooring technologies, using new designs, materials and construction approaches. Will make contribution to the UK's target of 1GW of floating wind capacity in UK waters by 2030 and together with Blue Gem’s Erebus project and TwinHub’s project at the WaveHub site, quadruple the capacity of the floating wind pipeline in the Celtic Sea to over 400MW.  The Crown Estate is also continuing its work (announced in March) to design a new leasing opportunity for early commercial-scale floating wind projects in the Celtic Sea. This will focus on projects of circa 300MW each in scale.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
100 MW
4C Offshore | Location Map: Lat(51.335) Lon(-5.266)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
100 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Celtic Sea
Latitude
51.334707°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life