Round 4 - Area 2 (RWE Renewables) Offshore Wind Farm

09 Feb 2021: Update 9th February 2021: Preparations for the plan-level Habitats Regulations Assessment (HRA) are now underway. Update 15th October 2020: Once bidding cycles are concluded the Plan-Level Habitats Regulations Assessment (HRA) stage will commence. Estimated to take between 9 and 12 months, this assessment will be undertaken by The Crown Estate, in its role as a Competent Authority, and will consider the possible impacts of Round 4 on relevant nature conservation sites of European importance. Hence the HRA process has been pushed back. Update 1/10/19: Plan-level HRA Autumn 2020 – Summer 2021 In accordance with The Crown Estate's role as a Competent Authority under the Habitats Regulations, it will undertake a PlanLevel Habitats Regulations Assessment (HRA) to assess the possible impact of the awarded projects on relevant nature conservation sites of European importance. The plan-level HRA for Round 4 is expected to take approximately nine months, starting in summer 2020.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1500 MW
4C Offshore | Location Map: Lat(54.501) Lon(1.904)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.500752°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life