Status:
Development Zone
Capacity:
Location:
United States

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Winyah Call Area
Country
United States
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
31 Aug 2016: The Bureau of Ocean Energy Management(BOEM) is reviewing the financial and technical qualifications of two wind companies that responded to the South Carolina call in 2015. BOEM are looking over the applications and requested additional information. “We’re conducting our final review and I believe we’ll have a determination on the qualifications this summer,” US Wind showed interest in the Grand Strand area, with Fishermen’s Energy showing interest in all four areas (Grand Strand, Cape Romain, Winyah and Charleston). BOEM reviewed applications and requested additional information. As of the 17th May BOEM were conducting final review and planning to have a determination on the qualifications this summer(2016). If only one qualified developer is interested in areas the agency will ask for acquisition fees of 25 cents an acre and conduct environmental assessments. If competitive interest continues for the Grand Strand call area, the bureau will complete area identification and environmental reviews and then move ahead with an auction process. BOEM recently incorporated two proposed wind energy areas in North Carolina(Wilmington West and Wilmington East) into the South Carolina leasing process because of concerns over wake effect, visual impacts and an expansion of the North Atlantic right whale critical habitat.
Power & Turbines
Windfarm capacity
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
Atlantic Ocean
Latitude
32.751°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore